A scanning vendor cannot invent your box taxonomy on move-in day. Before the truck arrives, agree on what every carton says on the outside, who initials that label, and how those fields map into the index your team will search later.
This checklist is an operations worksheet for FileVision project kickoffs. It is not legal advice and does not replace counsel or records-policy owners. FileVision’s document management and data capture solutions work best when box labels already match the retrieval fields you intend to keep.
Write the minimum fields every box must show
Require the same front-of-box block on every carton in the first wave: record series name, date range, department owner, box sequence number, and lifecycle status (active or inactive). Legal-hold status is a separate field — not a lifecycle category — and must be marked on its own when counsel says a carton is under hold. Optional fields can wait; missing required fields should stop a box from leaving the floor.
Print a one-page specimen and tape it to the staging cart so temporary help does not invent a second labeling style mid-morning.
Separate the physical label from the digital index key
The sticker on the carton is not the same object as the folder title in your repository. Map each label field to the index field it will become, including which ones are mandatory at ingest. If a field will not be searchable later, do not spend operator time writing it on every box.
FileVision’s ALFO document management platform only helps if those mapped fields match how staff already ask for files. Pilot the mapping on ten labeled boxes before the vendor’s full crew starts.
Ban mixed-series cartons in the first wave
One box, one primary series. Mixed HR and AP content under a vague “misc 2019” label creates two retention clocks and breaks later destroy decisions. Split mixed cartons before the vendor counts them as ready.
If a department insists on mixed boxes, document the exception owner, the sunset date, and who will re-box before imaging. Unsigned exceptions should not enter the vendor’s daily count.
Mark legal-hold boxes with a distinct visual cue
Legal hold is not the same as inactive lifecycle status. Hold material needs a color band or stamp that survives camera flash and warehouse dust. Do not rely on a handwritten note tucked inside the lid. Train the vendor that hold-marked boxes never enter a routine destroy-after-scan path.
List the hold IDs that must appear on both the exterior label and the intake sheet so counsel can reconcile cartons without opening each one.
Agree on sequence numbers the vendor will not renumber
Issue box IDs from your own log before the truck arrives. Vendors who renumber on the dock create a second inventory that never matches your department’s shelf list. Hand them a printed range and require those IDs on every intake photo.
Photograph the first and last labeled box in each pallet as a chain-of-custody sample. Keep those photos with the day’s manifest.
Define “label failure” before the first pallet moves
- Missing series name or date range
- No department owner initial
- Hold mark absent on a known hold carton
- Sequence number outside the issued range
- Illegible print that fails a phone-camera readability test
Any failed label returns to the department for correction; it does not ride to the scanning floor as a verbal promise.
Run a twenty-box label audit the afternoon before pickup
Pull twenty cartons at random from the staged wave. Check every required field, photograph three that pass and every one that fails, and record who fixed each failure. If more than two boxes fail, stop and re-train the floor crew before the vendor arrives.
Bring the audit sheet to the kickoff so the vendor sees your standard instead of negotiating labels under time pressure.
Hand the vendor a one-page label standard, not a hallway briefing
Attach the specimen label, the field-to-index map, the hold-mark legend, the issued ID range, and the failure rules. Ask the crew lead to initial the sheet. Verbal walkthroughs evaporate when a second shift arrives after lunch.
Keep a signed copy with the project file so later disputes about “what we agreed” have a single dated page to check.

